Project Address:Project Address: Zhangjiakou, He BeiEnergy storage capacity: 300MW/1.2GWh
Energy storage configuration: 240 sets of 20-foot liquid-cooled container battery cabinets -
Project Address:Xin JiangLocation:Xin Jiang
Energy storage capacity: 0.25GW/1GWh
ESS Configuration:224 units container ESS -
Project Address:Ning XiaLocation:Ning Xia
Energy storage capacity: 100MW/200MWh
ESS Configuration:60 units 20ft container ESS -
Project Address:Alashan Left Banner, Inner MongoliaEnergy storage capacity: 190MW/380MWh
Energy storage configuration: 76 sets of 20-foot liquid-cooled container battery cabinets -
Project Address:Xilin Gol league, Inner MongoliaEnergy storage capacity: 100MW/200MWh
Energy storage configuration: 40 sets of 20-foot liquid-cooled container battery system -
Project Address:Sunit Zuoqi, Inner MongoliaEnergy storage capacity: 100MW/200MWh
Energy storage configuration: 40 sets of 20-foot liquid-cooled container battery system -
Project Address:Daokoupu Street, Dongchangfu District, Liaocheng City, Shandong ProvinceInstalled capacity: Phase I photovoltaic installed capacity of 50MW, with storage capacity of 10MW/20MWh
Phase II photovoltaic installed capacity of 50MW, with storage capacity of 20MW/40MWh
Energy storage configuration: Three 40 foot liquid cooled container battery cabinets in Phase I -
Project Address:Ning Bo, Zhe JiangLocation:Ning Bo, Zhe Jiang
Energy storage capacity: 28 MW/36.34 MWh
ESS Configuration:12 units 30ft container ESS -
Project Address:Inner MongoliaLocation:Inner Mongolia
Energy storage capacity: 3MW/3.35MWh
ESS Configuration:1 units container ESS +1 unit high-voltage switching container -
Project Address:Installed capacity: 1MW/2MWh
Energy storage configuration: 4 sets of 10-foot energy storage containers -
Project Address:Wen Ling, Zhe JiangLocation:Zhe Jiang
Energy storage capacity: 750kW/1505kWh
ESS Configuration:1 units all-in-one container ESS -
Project Address:Chang Sha, Hu NanLocation:Chang Sha
Energy storage capacity: 100kW/215kWh * 5
ESS Configuration:5 units all-in-one cabinets ESS -
Project Address:Wenling, Zhejiang; Changsha, Hunan; Zhuzhou, Hunan; Lishui, Zhejiang; Zhaoqing, Guangdong; UK; Colombia, etc.Installed capacity: refer to the case.
Energy storage configuration: refer to the case. -
Project Address:Project location: Czech Republic, France, etc.Installed capacity: refer to the case.
Energy storage configuration: refer to the case.