Project Address:Daokoupu Street, Dongchangfu District, Liaocheng City, Shandong Province
100MW Smart Agriculture Photovoltaic Comprehensive Demonstration Project
Installed capacity: Phase I photovoltaic installed capacity of 50MW, with storage capacity of 10MW/20MWh
Phase II photovoltaic installed capacity of 50MW, with storage capacity of 20MW/40MWh
Energy storage configuration: Three 40 foot liquid cooled container battery cabinets in Phase I

The Daokou Sanyang Photovoltaic Power Station Supporting Energy Storage Power Station is a supporting energy storage power station for the first phase of the 100 MW Smart Agricultural Photovoltaic Power Generation Project in Dongchangfu District, supplied by AC New Energy. The equipment arrived on November 10, 2023 and successfully completed installation, debugging, and trial operation on December 29.


The 100 MW smart agricultural photovoltaic power generation project in Dongchangfu District was constructed with an investment of 245 million yuan from Three Gorges Group, involving eight villages in Daokoupu Street. At present, the first phase of the 50 MW project has been officially connected to the grid for power generation. Meanwhile, the second phase of the project has also begun construction and is expected to be fully completed by 2024. After the project is completed, it will generate 75 million kilowatt hours of green electricity annually, which can reduce coal by 20000 tons and carbon dioxide emissions by 40000 tons. The 25 year project period has brought a tax revenue of 110 million yuan to Liaocheng City, solved the employment of about 100 people in the local area, achieved resource complementarity, increased farmers' income, and increased agricultural efficiency, injecting new green energy into the work of street and rural revitalization.


c1.jpg

Aerial view of the 10MW/20MWh energy storage system of AC New Energy


c2.jpg

AC New Energy 40ft Container Battery Energy Storag System (3.45MW/6.7MWh) and PCS Booster Station


c3.jpg

AC New Energy 40ft Container Battery Energy Storag System (3.45MW/6.7MWh)


c4.jpg

Staff conduct grid connection inspections to ensure the safe operation of the entire unit