Project Address:Zhangjiakou, He Bei
Grid-Sharing Storage, 300MW/1.2GWh
Energy storage capacity: 300MW/1.2GWh
Energy storage configuration: 240 units 20-ft liquid-cooled container ESS
Project Highlights:Hebei's First Batch of Grid-Side Standalone ESS Demonstration Projects;Key Construction Project of Hebei Province

This project constructs a 300MW/1.2GWh energy storage station utilizing LFP batteries, supported by a new 220kV booster station connected via a single-circuit 220kV line to the Jiefang 500kV substation. The system consists of 60 identical 5MW/20MWh energy storage units, each configured with four 1,250kW PCS units and one 5,200kVA dual-winding step-up transformer. Each energy storage unit integrates battery racks, PCS, and transformers, where a 5MWh battery rack connects to one 1,250kW PCS unit. Four PCS units feed into one 5,200kVA dual-winding step-up transformer (35kV high-voltage side), with every five such transformer units converging into one 35kV collection feeder. Twelve 35kV feeders deliver power to the project’s 220kV booster station.

 As Hebei’s first batch of grid-side standalone ESS demonstrations and a provincial Key Construction Project, this represents China’s largest commissioned grid-side standalone ESS by installed capacity.


察北项目1.jpg

察北项目打码 (1).jpg

察北项目打码 (2).jpg

察北项目打码 (3).jpg

  • Address:
    No. 2 Qigui Road, Nanbu Community, Longtian Street, Pingshan District, Shenzhen
  • Tel:
    0755-89210030
  • E-mail:
    ac@anchengne.com
  • Zip Code:
    518122
Follow Us